LFNT Avignon-Pujaut Airfield — Charts, Approach Plates & Operations
Airport charts, approach plates, and operational data for Avignon-Pujaut Airfield (LFNT) directly from the official Aeronautical Information Publication.
Airport Operations
LFNT is NOT open to the public and requires prior permission from the townhall of Pujaut which is hard to obtain. The only language accepted for air-to-air communication is French. Airport has three runways with displaced thresholds.
Fuel & Services
Parking & Handling
PPL / GA Operations
Prior permission required from townhall of Pujaut and is difficult to obtain. French language only for A/A communications. All runways have displaced thresholds ranging from 427-1047 feet.
Source: AIP data extracted Apr 23, 2026. Always verify with official AIP before flight. View source
Radio Frequencies
No Frequencies Available
Radio frequency data is not available for this airport.
For current frequencies, please refer to:
- • Official airport charts
- • AIP publications
- • Flight information service
Aeronautical Information Publication (AIP)
✓ Free Access
Access Information:
Freely accessible online
Access details: Free online
Frequently Asked Questions
How many charts are available for LFNT Avignon-Pujaut Airfield?
Official charts for LFNT are published in the national Aeronautical Information Publication (AIP). Chart data for this airport is being added to our database.
Where can I find instrument approach plates for LFNT?
All instrument approach procedures (IAP) for LFNT Avignon-Pujaut Airfield are available on this page, linking directly to the official PDF charts published by the aviation authority. These include ILS, RNAV/GPS, VOR and LOC approaches for all runways.
Are the charts for LFNT free?
Yes, all chart links on this page point to official free sources including FAA d-TPP, EUROCONTROL eAIPs, and national aviation authority publications. No subscription required.
How often are charts updated?
Official charts follow the AIRAC cycle and are updated every 28 days. The links on this page always point to the current effective cycle from the official source.